Design and supply of digestate drying equipment
To design, supply and commission equipment to dry and pack digestate produced by biogas plant.
Termiņš
Piedāvājumu iesniegšanas termiņš bija 2013-04-12.
Iepirkums tika publicēts 2013-04-04.
Kas?
Ko?
Iepirkumu vēsture
Datums |
Dokuments |
2013-04-04
|
Paziņojums par līgumu
|